TDI
TDI-Brooks Completes Subsea Cable Survey Project Offshore Alaska
TDI-Brooks recently completed a third-party geotechnical project offshore Alaska, supporting a short cable route survey for Woolpert utilizing their Gravity CPT Stinger (gCPT) system. The project consisted of a geophysical and geotechnical survey for a marine cable route in the Valdez Arm.
Designed for rapid deployment in remote and challenging environments, the gCPT tool enables efficient in-situ soil characterization without the need for conventional drilling. The system transports a piezocone penetrometer (PCPT) to the seabed, where it captures high-resolution data from the mudline to depths of 5 meters and often exceeding 10 meters below mudline (BML).
Piezocone testing is a widely accepted method for offshore site investigations, providing continuous measurements such as tip resistance, sleeve friction, and pore pressure—key parameters used to evaluate soil strength and stratigraphy in real time.
For cable route engineering, these insights are critical in identifying:
Related Stories
Technology
Piyush Goyal backs global growth push for Indian startups; Gajwani flags AI gap
2 hours ago
Technology
Keeping sight of privacy concerns over smart glasses
3 hours ago
Technology
Telefónica’s Wayra Brings Start
5 hours ago
Technology
Enterprise Minister heads to Boston to grow Wales' AI and technology trade links
7 hours ago
Technology
Former Sharp CEO loses court case against Foxconn Technology
9 hours ago
Technology
Greens push for right to sue big tech as Labor axes ministerial powers
10 hours ago
Technology
NBA commissioner Adam Silver hints at major technology move for 2027
10 hours ago
Technology
The punks trying to reclaim the internet from 'big tech'
10 hours ago